Inicio de operaciones: 29 de enero 2025 / Nuevo Aeropuerto Jorge Chávez

Images Gallery

Control Tower

The new control tower is at the same level as the towers of the best airports in the world. It has a height of 65 meters and is built with reinforced concrete combined with a steel structure.

Second runway

The second runway is 3,480 meters long and has a network of taxiways more than 10 kilometers long. This will double the operational capacity of the airport, allowing two landings per minute.

New passenger terminal

This would be the first terminal in Peru that contains seismic isolation devices that are placed on the basement pillars separating the structures that are on the ground from the final foundation.

General works

The New Jorge Chávez will turn Lima into an important hub for the region and will allow it to grow according to the demand for passenger traffic. A global terminal that will connect South America with the world!

Infographics for the press

Get all the information on the progress of the Jorge Chávez International Airport Expansion Project. Download the files to see the details