Programa una visita al Jorge Chávez  Aquí

Inicio de operaciones: 18 de diciembre / Primera ciudad aeropuerto Jorge Chávez

LAP surprises with innovative 5-level infrastructure for the new single passenger terminal

In 2025 the New Jorge Chavez awaits us with a unique passenger terminal at the forefront of the best airports in the world.

The new unique passenger terminal that LAP is building, and which will start operating in 2025, has characteristics that put it at the forefront of infrastructures of its kind in Latin America and the world. The architecture of the single terminal project is inspired by the hummingbird of the Nazca culture and will have a constructed area of ​​210,000 square meters where a 5-level infrastructure will be located in charge of processing arrivals, check-in, departures, VIP rooms, among other services for the passenger that will meet the requirements of the IATA Manual.

These are the services that it will offer for each level:

These 5 levels will be complemented by 3 boarding docks for national, international and swing flights. This project, in charge of LAP, is 31% complete and will be the first air terminal in South America to have seismic isolation devices, technology that isolates the movement of the structure.

The new single passenger terminal will come into operation in January 2025 and will have an approximate capacity of 30 million passengers per year.